Projects

Civil Engineering and Concrete Works at St Otteran’s Hospital in Waterford for Nevin Construction Building Contractors

Value: €500,000

  • Site Enabling Works
  • Reduced Level Dig
  • Full Site Services Infrastructure: Foul and Surface, Water Drainage, Watermains, ESB, Public Lighting
  • Full Roads Infrastructure: Road Build Up, Concrete Kerbing, Tarmacadum & Line Marking
  • Full Car Park Construction for 40 Car Spaces
  • Reinforced Concrete Retaining Walls, Entrance Ramps and New Lift Pits

Civil Engineering and Concrete Works for 72 Housing Units for Frisby in Waterford

  • Site Enabling Works and Reduced Level Dig
  • Rock Breaking
  • Full Site Services Infrastructure: Foul and Surface Water Water Drainage, Watermains, ESB, Public Lighting
  • Full Roads Infrastructure: Road Build Up, Concrete Slipform Kerbing, Tarmacadum and Line Marking
  • House Bases and Curtilage Works: Drainage, Footpaths, Driveways
  • Full Site Landscaping and Fencing Installations

Project Value : €150m
Package Value: €450,000

  • Site Enabling Works
  • Reduce Level Excavation
  • Ground Beam & Pile Cap Excavations
  • Steel fixing, RC Works to Ground Floor Structure
  • Radon Installations
  • Full Site Services including Gas, Watermain, Attenuation Tanks, Petrol Interceptors
  • Reinforced Concrete Ramps & Retaining Walls
  • Road and Path preparations and installation
  • Landscaping
  • All works completed in live production environment

BONHAM ST RESIDENTIAL

Civil Engineering and Concrete Works for Bonham Street Residential Development

Project Value : €18 m
Package Value: €1,000,000

  • Site Enabling Works
  • Reduce Level Excavation
  • Ground Beam & Pile Cap Excavations
  • Steel fixing, RC Works & Waterproofing to Ground Beams
  • Full Site Services including, Gas, Watermain, Attenuation Tanks, Petrol Interceptors etc
  • Reinforced Concrete Ramps & Retaining Walls
  • Concrete Frame & Upper Floors
  • Road and Path preparations and installation
  • Landscaping

MSD BALLYDINE BCON API

Expansion of Existing Pharmaceutical Production at MSD Ballydine

Project Value : €140m
Package Value: €1,000,000

  • Site Enabling Works
  • Site Compound & Carpark Establishments
  • Reduce Level Excavation
  • Ground Beam & Pile Cap Excavations
  • Steel fixing, RC Works to Ground & Upper Floors
  • Full Site Services including Process, Gas, Watermain, Attenuation Tanks, Petrol Interceptors
  • Reinforced Concrete Tanks & Bunds
  • Road and Path preparations and installation
  • Landscaping
  • All works completed in live production environment

Civil Engineering and Concrete Works for
New Warehouse Facility, North City Business Park (Repeat Project)

  • Site Enabling Works
  • Reduce Level Excavation
  • Ground Beam and Pile Cap Excavations
  • Steelfixing, RC Works to Ground Floor Structure
  • Full Site Services including, Gas, Watermain, Attenuation Tanks, Petrol Interceptors 
  • Reinforced Concrete Ramps and Retaining Walls
  • Concrete Upper Floors
  • Road and Path preparations and installation
  • Landscaping

Civil Engineering and Concrete Works for
New Warehouse Facility, North City Business Park

  • Site Enabling Works
  • Reduce Level Excavation
  • Ground Beam and Pile Cap Excavations
  • Steelfixing, RC Works to Ground Floor Structure
  • Full Site Services including, Gas, Watermain, Attenuation Tanks, Petrol Interceptors 
  • Reinforced Concrete Ramps and Retaining Walls
  • Concrete Upper Floors
  • Road and Path preparations and installation
  • Landscaping

FERRYBANK PRIMARY CARE

Civil Engineering and Concrete Works for Ferrybank PCC

Project Value : €10m
Package Value: €850,000

  • Site Enabling Works
  • Reduce Level Excavation
  • Ground Beam and Pile Cap Excavations
  • Steelfixing, RC Works and Waterproofing to Ground Floor Structure
  • Full Site Services including, Gas, Watermain, Attenuation Tanks, Petrol Interceptors 
  • Reinforced  Concrete Ramps and Retaining Walls
  • Concrete Frame and Upper Floors
  • Road and Path preparations and installation
  • Landscaping

Project Value : €20m
Package Value: €450,000

  • Reduce Level Excavation
  • Foundation Pad Excavations
  • Steel fixing & RC Works to Pad & Strip Foundations
  • RC Retaining Walls & Loading Docks
  • Site Services including Attenuation Tanks, Petrol Interceptor
  • Reinforced FM2 Concrete Slab

BRAY PCC

Project Value : €18 m
Package Value: €1,000,000

  • Car Park Basement Slab & Retaining Walls, Upper Slab to Metal Decking
  • Insitu Ramp Walls & Slabs to Car Park
  • Primary Care Ground Floor & Upper Floor Slabs
  • Reinforced Concrete Stair Cores & Lift Core Walls
  • Reinforced Concrete Columns & Beams

LIDL YOUGHAL

Project Value : €2.5m
Package Value: €550,000

  • Site Enabling Works
  • Reduce Level Excavation
  • Ground Beam & Pile Cap Excavations
  • Steel fixing & RC Works to Strip & Pad Foundations & Main Shop Slab
  • Full Site Services including Gas, Watermain, Attenuation Tanks, Petrol Interceptors etc
  • Reinforced Concrete Rams & Retaining Walls
  • Road & Path Preparations & installation

Project Value : €5.5m
Package Value: €350,000

  • Basement Slab & One-Sided Retaining Walls
  • Reinforced Suspended Concrete Upper Floors
  • Reinforced Concrete Stair Cores & Lift Core Walls

ALDI YOUGHAL

Project Value : €2.5 m
Package Value: €450,000

  • Site Enabling Works
  • Reduce Level Excavation
  • Pile Cropping & Preparation
  • Ground Beam & Pile Cap Excavations
  • Steelfixing & RC Works to Strip Foundations & Main Shop Slab
  • Full Site Services including Gas, Watermain, Attenuation Tanks, Petrol Interceptors etc
  • Reinforced Concrete Ramps & Retaining Walls
  • Road & Path Preparations & Installation

MSD CARLOW 2

Project Value : €200m
Package Value: €750,000

Civil Engineering and Concrete Works for MSD Carlow 2

  • Site Enabling Works
  • Reduce Level Excavation
  • Ground Beam & Pile Cap Excavations
  • Steel fixing and RC Works to Strip and Pad Foundations to Production Building, Warehouse, CUB, and Energy Centre
  • Full Site Services including Process Pipework, Gas, Watermain, Attenuation Tanks, Petrol Interceptors etc
  • RC Process Sump Construction
  • Reinforced Concrete Ramps & Retaining Walls
  • Road and Path preparations and installation

Project Value : €60m
Package Value: €750,000

  • Site Enabling Works
    • Diversion of Existing Services
    • Road Realignment
    • Reduced Level Dig
    • Piling Mat
    • CMT Compound
    • Car Park
  • C&S Works to R&D Extension
    • Pile Cropping & Preparation
    • Foundations & Groundworks
    • Installation of Site Services
    • Attenuation Tank

CORK STREET RESIDENTIAL

Civil Engineering and Concrete Works for Cork Street Residential Development

Project Value : €18 m
Package Value: €550,000

  • Site Enabling Works
  • Reduce Level Excavation
  • Ground Beam & Pile Cap Excavations
  • Steel fixing, RC Works & Waterproofing to Ground Beams
  • Full Site Services including, Gas, Watermain, Attenuation Tanks, Petrol Interceptors etc
  • Reinforced Concrete Ramps & Retaining Walls